Part O has been a mandatory requirement since June 2022 for new residential buildings in England. Building control won't sign off without it, and getting caught out late in the programme, after glazing and layouts are fixed, is an expensive place to discover an overheating problem.
In April 2026 the government announced a review of Approved Document O following industry feedback. Until a revised document is published, the 2021 edition continues to apply, and we will flag any change that affects a live project.
Simplified Method or Dynamic Modelling: We Cover Both Routes
Approved Document O sets out two ways to demonstrate compliance, and which one suits your project depends on the design.
The simplified method is a set of fixed rules on glazing area and free area for ventilation. It's quick to apply, but it's conservative. Schemes with larger glazing areas, exposed sites, or shading the method gives no credit for can fail it even when the building would perform perfectly well in reality. Highly insulated, airtight homes also tend to need the dynamic route, because the simplified method says nothing about how heat escapes.
Dynamic thermal modelling, following the CIBSE TM59 methodology, tests how the building actually behaves, hour by hour, room by room, against a full year's weather data. We model using CIBSE weather files local to the site, based on the 2020 DSY1 data set, along with DSY2 and DSY3 as recommended by TM59. It's the route that gives you the most design freedom, and it's often the only realistic option once a scheme is beyond early massing and the glazing strategy is set.
We'll tell you early which route fits your project, and run the assessment accordingly, including a mix of both across a single site where that's the more efficient approach.
Every TM59 assessment includes:
- Room-by-room zoning of the whole building or a representative sample, agreed with you based on the scheme's size and risk
- Testing against both TM59 pass criteria: living areas and bedrooms
- A completed Part O compliance report, matching Appendix B's checklist requirements
- Clear identification of which design features are doing the work, so the strategy holds if the design changes later
- Practical mitigation recommendations where a unit doesn't pass first time: shading, opening areas, g-values, or mechanical cooling where passive measures aren't enough
Mixed-Use Schemes
Part O applies only to new residential buildings, so extensions, conservatories added to existing homes, and buildings undergoing a change of use fall outside its scope. Where it does still apply is mixed-use schemes: residential over commercial, for example, need Part O applied to the residential element, alongside whatever compliance route the non-domestic space follows separately. We'll confirm early which parts of a mixed-use scheme are actually in scope, so the assessment is targeted correctly from the outset.