Which Part L Route Does Your Project Need?
Both routes carry through to an EPC at completion, generated from the confirmed as-built calculation.
Not sure which applies to your project, or working on a mixed-use scheme that needs both? Get in touch and we'll confirm the right route before any modelling starts.
More detail: how SAP, SBEM and DSM compare, what SBEM and a BRUKL report show, and Part L for extensions and conversions.
What Part L 2021 Requires
Part L 2021 came into force in June 2022. For new buildings it sets targets the proposed design has to beat, calculated for a notional building of the same size and shape: a target emission rate (TER) and a target primary energy rate (TPER). The real design's emission rate and primary energy rate are then checked against them. There are also minimum standards for the fabric and building services: U-values, air permeability, system efficiencies and controls. Building control sees the calculation twice, at design stage before work starts and as built after completion with the measured air test, and the EPC is produced from the as-built figures.
- 01Concept StageConcept design to establish performance
- 02Design StageDetailed inputs before construction starts
- 03As BuiltFinal submission to building control and EPC lodgement