1. Home
  2. Part L Compliance & EPC

Part L Compliance & EPC

Working to Part L 2021 (Approved Document L, volumes 1 and 2) and SAP 10.2

Part L compliance is assessed differently depending on whether the building is residential or non-domestic, and each route has its own calculation method, its own software, and its own accreditation. We carry out both, using recognised compliance software, from the design stage calculation through to the as-built assessment and EPC.

Talk to an engineer or call 0114 312 1105

Which Part L Route Does Your Project Need?

Both routes carry through to an EPC at completion, generated from the confirmed as-built calculation.

Not sure which applies to your project, or working on a mixed-use scheme that needs both? Get in touch and we'll confirm the right route before any modelling starts.

More detail: how SAP, SBEM and DSM compare, what SBEM and a BRUKL report show, and Part L for extensions and conversions.

What Part L 2021 Requires

Part L 2021 came into force in June 2022. For new buildings it sets targets the proposed design has to beat, calculated for a notional building of the same size and shape: a target emission rate (TER) and a target primary energy rate (TPER). The real design's emission rate and primary energy rate are then checked against them. There are also minimum standards for the fabric and building services: U-values, air permeability, system efficiencies and controls. Building control sees the calculation twice, at design stage before work starts and as built after completion with the measured air test, and the EPC is produced from the as-built figures.

  1. 01Concept StageConcept design to establish performance
  2. 02Design StageDetailed inputs before construction starts
  3. 03As BuiltFinal submission to building control and EPC lodgement

Last reviewed: November 2026

Questions

FAQs

What is the difference between Part L1 and Part L2?

Part L1 (Approved Document L, volume 1) covers dwellings and is assessed with SAP. Part L2 (volume 2) covers buildings other than dwellings and is assessed with SBEM or dynamic simulation, producing a BRUKL report.

When does building control need the calculation?

Before work starts, as a design stage submission, and again at completion as the as-built calculation with the measured air permeability. The EPC comes from the as-built figures.

Do you cover mixed-use schemes?

Yes. Residential over commercial, for example, needs a SAP assessment for the dwellings and a BRUKL assessment for the non-domestic space, coordinated so the specifications line up.

Talk to an Engineer

Tell us about your project and we will confirm the right Part L route.

Talk to an engineer

Accredited by

CIBSE Low Carbon Energy AssessorCIBSE Low Carbon ConsultantElmhurst Energy Approved

Get in touch

Send drawings, fee proposal within 1 working day.

Office address
Spaces Acero, 1 Concourse Way, Sheffield, S1 2BJ
How we use your details