This article covers new dwellings in England under Approved Document L, Volume 1: Dwellings, 2021 edition incorporating 2023 amendments, which applies now, and the 2026 edition, which takes effect on 24 March 2027 (24 September 2027 for higher-risk building work). Wales, Scotland and Northern Ireland have their own documents. Extensions and conversions follow different rules.
The three targets
| Target | Units | What it is influenced by | Compared with |
|---|---|---|---|
| Target primary energy rate (TPER) | kWhPE/m² per year | Fabric and fuel | Dwelling primary energy rate (DPER) |
| Target emission rate (TER) | kgCO2/m² per year | Fabric and fuel | Dwelling emission rate (DER) |
| Target fabric energy efficiency rate (TFEE) | kWh/m² per year | Fabric only | Dwelling fabric energy efficiency rate (DFEE) |
Source: Approved Document L, Volume 1, 2021 edition incorporating 2023 amendments, paragraphs 1.2 and 2.3.
Paragraph 2.16 lets the designer meet the primary energy and emission targets with any mix of fabric, efficient services and low or zero carbon technologies. Paragraph 2.17 is the one that catches people out: the fabric target can be met only through fabric energy efficiency. The approved document adds that some elements will need to be significantly better than the limiting values to meet it.
The 2021 notional dwelling
The targets come from a notional dwelling with standard fabric and services. The full specification is in Appendix R of SAP 10; Table 1.1 of the approved document summarises it. The main values:
| Element or system | Notional value |
|---|---|
| External walls | U = 0.18 W/m²K |
| Floors | U = 0.13 W/m²K |
| Roofs | U = 0.11 W/m²K |
| Windows and glazed doors (over 60% glazed) | U = 1.2 W/m²K, frame factor 0.7 |
| Opaque and semi-glazed doors | U = 1.0 W/m²K |
| Openings | Same as the actual dwelling, up to 25% of total floor area |
| Air permeability | 5 m³/(h·m²) at 50 Pa |
| Ventilation | Natural ventilation with intermittent extract fans |
| Heating and hot water | Mains gas boiler, 89.5% efficient, radiators at 55 °C design flow temperature |
| Wastewater heat recovery | All showers, 36% recovery efficiency |
| Lighting | 80 lm/W |
| Photovoltaics | Houses: kWp = 40% of ground floor area / 6.5, facing south-east to south-west |
Source: Approved Document L, Volume 1, 2021 edition incorporating 2023 amendments, Table 1.1. Flats use a different PV formula based on the number of storeys in the block.
The notional dwelling has PV and wastewater heat recovery whether or not the actual design does. A gas-heated house with no PV and no wastewater heat recovery has to make up the difference elsewhere.
Limiting fabric values
Whatever the targets say, each element must meet the limiting values. They are the same in the 2021 and 2026 editions.
| Element | Maximum U-value, W/m²K (area-weighted) |
|---|---|
| All roof types | 0.16 |
| Walls | 0.26 |
| Floors | 0.18 |
| Party walls | 0.20 |
| Swimming pool basin | 0.25 |
| Windows, roof windows and curtain walling | 1.6 |
| Rooflights | 2.2 |
| Doors, including glazed doors | 1.6 |
| Air permeability | 8.0 m³/(h·m²) at 50 Pa, or 1.57 m³/(h·m²) at 4 Pa |
Source: Approved Document L, Volume 1, 2021 edition incorporating 2023 amendments, Table 4.1; 2026 edition, Table 3.1.
Compare these with the notional values above: a wall at the 0.26 limit is well short of the notional 0.18, which is why a design built to the limiting values alone rarely meets the fabric target.
Why SAP calculations fail
In our experience most failures come from a handful of causes, and most are fixed more cheaply at design stage than on site.
- Fabric target missed. The usual cause is walls, floors or windows specified near the limiting values. Only better fabric fixes it.
- Thermal bridging left at the default. The 2021 edition allows a default y-value of 0.20 W/m²K (paragraph 4.18d). That is a large heat loss compared with calculated or accredited junction details, and it can cost the fabric target on its own. The 2026 edition no longer lists the default y-value as an option (paragraph 3.19).
- Air test worse than the design figure. The as-built calculation uses the measured air permeability (paragraph 2.2). If the design assumed a low figure and the test comes in higher, the as-built result can fail even though the design stage passed. Every new dwelling needs a test (paragraph 7.4), and failed tests must be reported too (paragraph 7.7).
- Products substituted on site. A different window, insulation board or boiler changes the result. Paragraph 4.17d asks for any substitution to be reflected in the SAP calculation and the BREL report.
- Missing photographs. The as-built BREL report is signed by the assessor to confirm the photographs have been reviewed (Appendix B, paragraph B4). Appendix B lists the details to photograph for each dwelling, before they are covered up.
What changes with the 2026 edition
| Topic | 2021 edition (incorporating 2023 amendments) | 2026 edition |
|---|---|---|
| Calculation method | SAP 10 | The Home Energy Model (HEM) or SAP 10.3, each for the period in its Notice of Approval |
| Notional heating | Mains gas boiler | Heat pump; in the SAP 10.3 notional dwelling, a coefficient of performance of 2.5 for all dwellings |
| Solar PV | Part of the notional dwelling | A separate legal requirement, L3, for on-site renewable electricity |
| Three targets | TPER, TER, TFEE | Unchanged |
| Limiting U-values and air permeability | Table 4.1 | Unchanged, now Table 3.1 |
| Default y-value of 0.20 W/m²K | Allowed | Not listed |
| Averaging targets across a building | Allowed for a block of flats or a terrace of houses | Allowed for a building containing flats; not for a row of terraced houses |
| District heat networks | Notional uses the network's factors only for an existing network | A "sleeving" route, with a validated declaration that at least 90% of the heat comes from new or unused low carbon capacity |
Sources: Approved Document L, Volume 1, 2021 edition incorporating 2023 amendments, paragraphs 1.4, 1.7, 4.18 and Table 1.1; 2026 edition (revised under Circular Letter 04/2026), paragraphs 1.3, 1.8 to 1.10, 3.19 and page 11; Future Homes and Buildings Standards consultation response (March 2026), paragraph 3.9.
For requirement L3, the 2026 edition's benchmark for a house is PV at 0.22 kWp per m² over an area equal to 40% of the ground floor area, facing south-east to south-west at a 45° pitch and not overshaded, or a reasonable alternative that matches its annual output (paragraph 5.73). For a building containing flats the same rule applies to the building's ground floor area, which for a multi-storey block is the gross internal area divided by the number of storeys (paragraph 5.74 and equation 5.2). Where the roof can't fit an array that would generate 720 kWh a year (per dwelling, divided by the number of storeys, for a block), paragraph 5.77 treats it as an exceptional case, with evidence to building control.
Which edition applies to your project
The 2026 edition doesn't apply to work where a building notice, initial notice or full plans application was given before 24 March 2027, provided the work on that building starts before 24 March 2028. For higher-risk building work, the cut-off is a valid building control approval application to the Building Safety Regulator before 24 September 2027 (Circular Letter 01/2026). Transitional protection is building by building, so on a phased site some plots may be built to the 2021 edition and some to the 2026 edition.
Before the SAP model: a checklist
- Confirm which edition of Approved Document L applies, from the date of the building control submission and the expected start on site.
- Get plans, sections and elevations, with the window and door schedule.
- Specify wall, roof and floor build-ups with their U-values, aiming well below the limiting values.
- Decide on thermal bridging: calculated junctions, an accredited details library, or SAP Table K1 values.
- Set a design air permeability that the contractor can actually achieve on test.
- Confirm the heating and hot water system, ventilation system and any wastewater heat recovery.
- For the 2026 edition, check the roof area and orientation for the L3 PV benchmark early, before the roof design is fixed.
- Agree who will take the Appendix B photographs on site, and when.
- Rerun the SAP calculation for every change of product or specification before it is ordered.
More on the service: Part L1 SAP calculations and EPC and Part L compliance.



