1. Home
  2. Knowledge & Tips
  3. Part L1 for New Homes: The Three SAP Targets and What Changes in 2027

Part L1 for New Homes: The Three SAP Targets and What Changes in 2027

A new home in England passes Part L1 by meeting three targets, not one: the target primary energy rate, the target emission rate and the target fabric energy efficiency rate. Each is calculated in SAP for a notional dwelling of the same size and shape, and the actual design must be no worse on all three, at design stage and again as built with the measured air test result. It must also meet the limiting U-values and air permeability. The fabric target can only be met through the fabric, so a heat pump or solar panels won't rescue a design that fails it. From 24 March 2027 the 2026 edition of Approved Document L replaces the gas boiler in the notional dwelling with a heat pump and adds a separate requirement for on-site renewable electricity.

Talk to an engineer or call 0114 312 1105

This article covers new dwellings in England under Approved Document L, Volume 1: Dwellings, 2021 edition incorporating 2023 amendments, which applies now, and the 2026 edition, which takes effect on 24 March 2027 (24 September 2027 for higher-risk building work). Wales, Scotland and Northern Ireland have their own documents. Extensions and conversions follow different rules.

The three targets

TargetUnitsWhat it is influenced byCompared with
Target primary energy rate (TPER)kWhPE/m² per yearFabric and fuelDwelling primary energy rate (DPER)
Target emission rate (TER)kgCO2/m² per yearFabric and fuelDwelling emission rate (DER)
Target fabric energy efficiency rate (TFEE)kWh/m² per yearFabric onlyDwelling fabric energy efficiency rate (DFEE)

Source: Approved Document L, Volume 1, 2021 edition incorporating 2023 amendments, paragraphs 1.2 and 2.3.

Paragraph 2.16 lets the designer meet the primary energy and emission targets with any mix of fabric, efficient services and low or zero carbon technologies. Paragraph 2.17 is the one that catches people out: the fabric target can be met only through fabric energy efficiency. The approved document adds that some elements will need to be significantly better than the limiting values to meet it.

The 2021 notional dwelling

The targets come from a notional dwelling with standard fabric and services. The full specification is in Appendix R of SAP 10; Table 1.1 of the approved document summarises it. The main values:

Element or systemNotional value
External wallsU = 0.18 W/m²K
FloorsU = 0.13 W/m²K
RoofsU = 0.11 W/m²K
Windows and glazed doors (over 60% glazed)U = 1.2 W/m²K, frame factor 0.7
Opaque and semi-glazed doorsU = 1.0 W/m²K
OpeningsSame as the actual dwelling, up to 25% of total floor area
Air permeability5 m³/(h·m²) at 50 Pa
VentilationNatural ventilation with intermittent extract fans
Heating and hot waterMains gas boiler, 89.5% efficient, radiators at 55 °C design flow temperature
Wastewater heat recoveryAll showers, 36% recovery efficiency
Lighting80 lm/W
PhotovoltaicsHouses: kWp = 40% of ground floor area / 6.5, facing south-east to south-west

Source: Approved Document L, Volume 1, 2021 edition incorporating 2023 amendments, Table 1.1. Flats use a different PV formula based on the number of storeys in the block.

The notional dwelling has PV and wastewater heat recovery whether or not the actual design does. A gas-heated house with no PV and no wastewater heat recovery has to make up the difference elsewhere.

Limiting fabric values

Whatever the targets say, each element must meet the limiting values. They are the same in the 2021 and 2026 editions.

ElementMaximum U-value, W/m²K (area-weighted)
All roof types0.16
Walls0.26
Floors0.18
Party walls0.20
Swimming pool basin0.25
Windows, roof windows and curtain walling1.6
Rooflights2.2
Doors, including glazed doors1.6
Air permeability8.0 m³/(h·m²) at 50 Pa, or 1.57 m³/(h·m²) at 4 Pa

Source: Approved Document L, Volume 1, 2021 edition incorporating 2023 amendments, Table 4.1; 2026 edition, Table 3.1.

Compare these with the notional values above: a wall at the 0.26 limit is well short of the notional 0.18, which is why a design built to the limiting values alone rarely meets the fabric target.

Why SAP calculations fail

In our experience most failures come from a handful of causes, and most are fixed more cheaply at design stage than on site.

  • Fabric target missed. The usual cause is walls, floors or windows specified near the limiting values. Only better fabric fixes it.
  • Thermal bridging left at the default. The 2021 edition allows a default y-value of 0.20 W/m²K (paragraph 4.18d). That is a large heat loss compared with calculated or accredited junction details, and it can cost the fabric target on its own. The 2026 edition no longer lists the default y-value as an option (paragraph 3.19).
  • Air test worse than the design figure. The as-built calculation uses the measured air permeability (paragraph 2.2). If the design assumed a low figure and the test comes in higher, the as-built result can fail even though the design stage passed. Every new dwelling needs a test (paragraph 7.4), and failed tests must be reported too (paragraph 7.7).
  • Products substituted on site. A different window, insulation board or boiler changes the result. Paragraph 4.17d asks for any substitution to be reflected in the SAP calculation and the BREL report.
  • Missing photographs. The as-built BREL report is signed by the assessor to confirm the photographs have been reviewed (Appendix B, paragraph B4). Appendix B lists the details to photograph for each dwelling, before they are covered up.

What changes with the 2026 edition

Topic2021 edition (incorporating 2023 amendments)2026 edition
Calculation methodSAP 10The Home Energy Model (HEM) or SAP 10.3, each for the period in its Notice of Approval
Notional heatingMains gas boilerHeat pump; in the SAP 10.3 notional dwelling, a coefficient of performance of 2.5 for all dwellings
Solar PVPart of the notional dwellingA separate legal requirement, L3, for on-site renewable electricity
Three targetsTPER, TER, TFEEUnchanged
Limiting U-values and air permeabilityTable 4.1Unchanged, now Table 3.1
Default y-value of 0.20 W/m²KAllowedNot listed
Averaging targets across a buildingAllowed for a block of flats or a terrace of housesAllowed for a building containing flats; not for a row of terraced houses
District heat networksNotional uses the network's factors only for an existing networkA "sleeving" route, with a validated declaration that at least 90% of the heat comes from new or unused low carbon capacity

Sources: Approved Document L, Volume 1, 2021 edition incorporating 2023 amendments, paragraphs 1.4, 1.7, 4.18 and Table 1.1; 2026 edition (revised under Circular Letter 04/2026), paragraphs 1.3, 1.8 to 1.10, 3.19 and page 11; Future Homes and Buildings Standards consultation response (March 2026), paragraph 3.9.

For requirement L3, the 2026 edition's benchmark for a house is PV at 0.22 kWp per m² over an area equal to 40% of the ground floor area, facing south-east to south-west at a 45° pitch and not overshaded, or a reasonable alternative that matches its annual output (paragraph 5.73). For a building containing flats the same rule applies to the building's ground floor area, which for a multi-storey block is the gross internal area divided by the number of storeys (paragraph 5.74 and equation 5.2). Where the roof can't fit an array that would generate 720 kWh a year (per dwelling, divided by the number of storeys, for a block), paragraph 5.77 treats it as an exceptional case, with evidence to building control.

Which edition applies to your project

The 2026 edition doesn't apply to work where a building notice, initial notice or full plans application was given before 24 March 2027, provided the work on that building starts before 24 March 2028. For higher-risk building work, the cut-off is a valid building control approval application to the Building Safety Regulator before 24 September 2027 (Circular Letter 01/2026). Transitional protection is building by building, so on a phased site some plots may be built to the 2021 edition and some to the 2026 edition.

Before the SAP model: a checklist

  1. Confirm which edition of Approved Document L applies, from the date of the building control submission and the expected start on site.
  2. Get plans, sections and elevations, with the window and door schedule.
  3. Specify wall, roof and floor build-ups with their U-values, aiming well below the limiting values.
  4. Decide on thermal bridging: calculated junctions, an accredited details library, or SAP Table K1 values.
  5. Set a design air permeability that the contractor can actually achieve on test.
  6. Confirm the heating and hot water system, ventilation system and any wastewater heat recovery.
  7. For the 2026 edition, check the roof area and orientation for the L3 PV benchmark early, before the roof design is fixed.
  8. Agree who will take the Appendix B photographs on site, and when.
  9. Rerun the SAP calculation for every change of product or specification before it is ordered.

More on the service: Part L1 SAP calculations and EPC and Part L compliance.

Questions

FAQs

What is the target fabric energy efficiency rate?

It is the energy efficiency of the notional dwelling's fabric, in kWh/m² per year. The actual dwelling's fabric energy efficiency rate must not exceed it. The approved document says it is influenced by the fabric only, so heating systems and renewables don't affect it.

Does every new home need an air test?

Yes. Paragraph 7.4 of the 2021 edition and paragraph 6.5 of the 2026 edition say an air pressure test should be carried out on every new dwelling. The measured result goes into the as-built SAP calculation.

Can a new home still have a gas boiler after March 2027?

The 2026 edition doesn't name a banned fuel, but the targets are set by a notional dwelling heated by a heat pump. A home with a gas boiler would have to make up the whole difference in primary energy and emissions elsewhere, which we don't expect to be achievable in practice.

Can flats in a block pass on an average?

Yes, under both editions. Targets and results can be averaged, weighted by floor area, across the flats in one building. They can't be averaged across separate buildings on a site, and under the 2026 edition not across a row of terraced houses.

Get the targets passed at design stage

Send us the plans, sections, elevations and the specification as it stands, and tell us when the building control submission is planned. We'll run the design stage SAP calculation in Elmhurst Design SAP 10, show which target is tight and what fixes it, and carry the same model through to the as-built calculation and EPC. Fee proposal within one working day.

Talk to an engineer

Accredited by

CIBSE Low Carbon Energy AssessorCIBSE Low Carbon ConsultantElmhurst Energy Approved

Get in touch

Send drawings, fee proposal within 1 working day.

Office address
Spaces Acero, 1 Concourse Way, Sheffield, S1 2BJ
How we use your details