BREEAM Ene 01: How the Energy Credits Are Scored

BREEAM Ene 01 scores a building's regulated energy from the same _brukl.inp file the Part L2 model produces. The BREEAM Platform compares the actual building with an "adjusted notional" building on three metrics: heating and cooling demand, primary energy and carbon emissions. Each metric is converted to an energy performance ratio (EPR) between 0 and 1, the three are weighted and added, and the total, EPRNC, sets the number of credits. The adjusted notional building always assumes a gas boiler for space heating, so the BREEAM score doesn't match the percentage improvement printed on the BRUKL.

This article covers new non-domestic buildings in England assessed under BREEAM UK New Construction Version 7, using the method BRE sets out in Guidance Note 52 (July 2025). Version 7.1 is now the default for new registrations; BRE describes it as a minor, targeted update to Version 7. Projects still registered under the 2018 scheme or Version 6 use the earlier method in Guidance Note 39, summarised further down.

What Ene 01 covers in each version

Scheme versionEne 01 titlePart L baseline for EnglandOperational energy prediction
UK New Construction 2018Reduction of energy use and carbon emissionsApproved Document L2A, 2013 editionInside Ene 01
UK New Construction V6.0 and V6.1Reduction of energy use and carbon emissionsApproved Document L volume 2, 2021 editionInside Ene 01
UK New Construction V7Energy and carbon performance for regulated energy usesApproved Document L volume 2, 2021 edition incorporating 2023 amendmentsMoved to its own issue, Ene 02

Under Version 7, Ene 01 deals with regulated energy only: heating, cooling, ventilation, lighting and hot water, as assessed by Part L. The prediction of total energy in use, including small power, lifts and catering, is scored separately in Ene 02.

The three metrics

MetricUnitsWhat moves itRead from the _brukl.inp file
Heating and cooling demandkWh/m² per yearFabric U-values, air permeability, glazing, internal gainsKWH/M2-HEAT-DEMAND and KWH/M2-COOL-DEMAND
Primary energykWh/m² per yearDemand, plus the efficiency of the systems and of the energy supplyPRIM-KWH/M2
Carbon emissionskgCO₂e/m² per yearDemand, system efficiency and fuel, including on-site renewablesKG/M2-CO2

The calculator also reads the energy use by each fuel, the generation from each renewable technology and the floor area of each HVAC system. The HVAC areas must add up to the total floor area, including any unheated areas modelled as "No Heating or Cooling".

The adjusted notional building

Part L compares the actual building with a notional building of the same size and shape. In most cases the Part L notional building is given the same type of heating system as the actual building. BREEAM changes that: to give a consistent baseline, the adjusted notional building always has a gas boiler for space heating, at a set efficiency.

This has two consequences:

  • The BRUKL percentage isn't the BREEAM score. A building that is 15% better than its Part L target can sit at a quite different point on the Ene 01 scale, because the baseline has changed.
  • A heat pump scores against a gas boiler. The actual building's heat pump is compared with the adjusted notional building's boiler, so its efficiency counts towards the primary energy and carbon metrics in a way it doesn't in the Part L comparison.

From metric to EPR

For primary energy and carbon, each EPR is calculated from the ratio of the actual building (A) to the adjusted notional building (Nadj):

EPR = 1 − (A / Nadj)n

where n is 1.7117 for primary energy and 1.3606 for carbon emissions in England, Scotland and Wales. A building that only matches the adjusted notional scores 0; a building with no consumption or no emissions scores 1. BRE set n so that an EPR of 0.65 sits at about the median performance of buildings certified under Version 6.

The demand metric uses a straight line instead:

EPRdem = 1.3 + 0.75 × (0.25 − A / Nadj)

capped between 0 and 1. Any building with heating and cooling demand 35% or more below the adjusted notional scores the full 1.

Improvement over the adjusted notionalPrimary energy EPRCarbon EPRDemand EPR
0% (equal to the notional)0.000.000.74
10%0.170.130.81
20%0.320.260.89
30%0.460.380.96
40%0.580.501.00
50%0.700.611.00
60%0.790.711.00

Calculated from the GN52 formulae. Values before weighting.

The table shows the shape of the scale. Primary energy and carbon reward each further improvement less than the one before, and the demand metric gives a high score to any building whose fabric is close to the notional.

The weightings

Version 7 doesn't weight the three metrics equally. The demand weighting depends on how much of the building's regulated energy goes on heating and cooling:

Heating and cooling energy / regulated energyDemand weightingPrimary energy weightingCarbon weighting
10% or less6.67%46.67%46.67%
20%13.33%43.33%43.33%
30%20.00%40.00%40.00%
40%26.67%36.67%36.67%
50% or more33.33%33.33%33.33%

Source: GN52 Table 1 (selected rows). Between 10% and 50%, the demand weighting is the ratio × 2/3, and the other two share the rest equally.

In an office where lighting, fans and hot water use more energy than heating and cooling, nearly all the score comes from primary energy and carbon. Fabric improvements still help, but mostly through the energy they save, not through the demand metric.

A worked example

BRE's own example in GN52 (Appendix A):

MetricActualAdjusted notionalEPRWeightingWeighted EPR
Primary energy (kWh/m² per year)701300.65340.36970.2416
Carbon (kgCO₂e/m² per year)722.50.79580.36970.2942
Demand (kWh/m² per year)55901.000 (capped)0.26060.2606
EPRNC0.7964

Heating (15) and cooling (6.5) use 21.5 of the 55 kWh/m² of regulated energy, a ratio of 0.39, which sets the demand weighting at 0.2606. BRE's example scores 7 credits. Your BREEAM assessor confirms the credit scale and minimum standards for the version your project is registered under.

Other rules that affect the score

  • Shell only: only the demand metric is used. The building services in the model must match the notional specification.
  • Several building types: up to 15 _brukl.inp files can be uploaded, and the score is area-weighted across them.
  • Existing district heating: where its primary energy or carbon factor is worse than a gas boiler of notional efficiency, the calculator substitutes the gas boiler figures. New district heating always uses its own factors.
  • District heating required by planning: if the connection is the only thing stopping the building reaching the Ene 01 minimum for Excellent or Outstanding, the minimum standard can be waived. The assessor raises a technical query with a second _brukl.inp file showing the same building with heat pumps (KBCN1766). The credits awarded are still based on the district heating model.
  • Excellent and Outstanding: under Version 7, the energy minimum standards can be met through either the Ene 01 score or the Ene 02 operational energy credits. Outstanding also needs no fuel combustion on site.

Projects registered under the 2018 scheme or Version 6

The earlier method in GN39 uses the same three metrics, but weights them equally at one third each, with no sliding scale. Demand is in MJ/m² per year. There are up to 9 standard credits on a linear scale:

EPRNCCreditsMinimum standard
0.11At least one Ene 01 credit
0.44Excellent
0.66Outstanding
0.99

Source: GN39 V3.0 (June 2023), Table 1. Excellent can also be reached through the operational energy prediction criteria (not for shell only).

These registrations remain valid for five years, so the older method is still in use on live projects. Check which version yours is registered under before the model is set up.

Before the model: a checklist

  1. Confirm the BREEAM version and issue the project is registered under.
  2. Confirm the rating target and the Ene 01 minimum standard it carries.
  3. Confirm whether the assessment is shell only, shell and core, or fully fitted.
  4. Confirm the heating strategy, and whether any fuel is burned on site.
  5. Check whether a district heating connection is a planning condition, and get the network's emission and primary energy factors.
  6. Split the building into one model per building type if it has more than one.
  7. Model every space with its correct HVAC system, including unheated areas.
  8. Run the Part L2 model and send the assessor the _brukl.inp file, not only the PDF.
  9. Where the score is close to a credit boundary, test fabric, lighting, ventilation and renewables options before the design is fixed.

More on the service: BREEAM Ene 01 and Ene 02 energy credits and Part L2 BRUKL and EPC.

Questions

FAQs

Can the Part L2 model be used for Ene 01?

Yes. Ene 01 is calculated from the _brukl.inp file produced by NCM-compliant software for the Part L2 assessment. The assessor uploads the file to the BREEAM Platform, which does the calculation.

Why is our Ene 01 score different from the BRUKL improvement?

BREEAM compares the building with an adjusted notional building that always has a gas boiler, and it scores three metrics on non-linear scales. The BRUKL compares emissions and primary energy with the Part L notional building, which usually has the same heating type as the actual building.

Does a heat pump help the Ene 01 score?

Usually. The adjusted notional building assumes a gas boiler, so an efficient heat pump improves the primary energy and carbon metrics, which carry most of the weighting in buildings where heating and cooling are a small share of regulated energy.

Can a building with gas boilers achieve Outstanding?

Not under Version 7. The Ene 01 and Ene 02 minimum standard for Outstanding requires no fuel combustion on site.

Know the score before the design is fixed

Send us the plans, sections, elevations, the services strategy and the BREEAM version and rating your project is targeting. We'll build the Part L2 model in IES VE, run it through the Ene 01 method, and test fabric, plant and renewables options where the score sits close to a credit boundary. Fee proposal within one working day.

Talk to an engineer

Accredited by

CIBSE Low Carbon Energy AssessorCIBSE Low Carbon ConsultantElmhurst Energy Approved

Get in touch

Send drawings, fee proposal within 1 working day.

Office address
Spaces Acero, 1 Concourse Way, Sheffield, S1 2BJ
How we use your details