- What we need from you
- Plans and areas; fabric and M&E specifications; renewables proposals; any heat network information; the borough and the planning stage.
- What you get
- An energy statement to the GLA template covering be lean, be clean, be green and be seen, with the carbon figures, EUI and space heating demand, ready for submission through your borough.
- How long it takes
- Fee proposal within 1 working day; we confirm the programme with the proposal.
The Energy Hierarchy
The GLA requires major developments to work through four stages, each one demonstrating a further reduction in carbon emissions against the Part L baseline for the building.
Be lean: reducing energy demand through fabric efficiency, airtightness, thermal bridging, ventilation heat recovery, efficient lighting and passive design, before any low carbon heating or renewables are considered. Energy efficiency alone must cut emissions by at least 10% for homes and 15% for non-residential space.
Be clean: supplying energy efficiently, by connecting to an existing or planned district heat network, using local secondary heat sources, or providing a communal system ready to connect. Developments in Heat Network Priority Areas follow the heating hierarchy in Policy SI 3.
Be green: maximising renewable energy on site, such as solar PV, heat pumps, solar thermal and storage. Heat pump savings count here, unless the heat pumps serve a district heat network.
Be seen: committing to monitor and report actual energy performance for five years after completion, compared against what was predicted at design stage.
Major developments must reach net zero carbon for regulated emissions, with at least a 35% reduction on site beyond Part L 2021. Residential and non-residential uses are tested separately. Where net zero can't be met on site, the shortfall is paid as a cash-in-lieu contribution into the borough's carbon offset fund, at £95 a tonne over 30 years unless the borough sets its own price.
- Part L baseline modelling, SAP for residential, SBEM or dynamic simulation for commercial and larger buildings
- Be lean, be clean, be green assessment through the full energy hierarchy
- Predictive energy modelling, such as CIBSE TM54, for the EUI and be seen reporting
- Energy Use Intensity and space heating demand reporting, alongside the regulated carbon figures
- A statement structured to the GLA's own template, ready for submission through your borough
Does Your Project Need One?
A GLA energy statement is generally required for major developments, typically 10 or more dwellings, or non-residential schemes over 1,000 square metres, though some boroughs set additional requirements below this threshold. Larger schemes, for example 150 homes or more, or large floorspace depending on location, are also referable to the GLA rather than assessed solely by the borough. We'll confirm early whether your project meets the threshold and what your specific borough expects on top of the core GLA requirements.
The Draft London Plan 2026
The Mayor published a draft new London Plan in July 2026. Consultation closed on 15 October 2026, and the GLA expects to submit it for examination in 2027. Until it's adopted, the London Plan 2021 and the 2022 guidance remain the policy.
The draft replaces the carbon targets with minimum standards for energy use intensity and space heating demand (draft Policy GHR1), removes the carbon offsetting policy, and asks every major development for a Low Carbon Heat Appraisal (draft Policy GHR2). If your scheme will be decided around the change, we'll check it against both. More detail in our guide to the London Plan energy hierarchy.
Why Work With Us
We're a specialist energy consultancy. This is the core of what we do, not a sideline. Every assessment runs through IES VE as standard, we turn changes around quickly, and results come back in a format your team, the borough, and the GLA can use immediately.