This article is based on TM54 (2022, second edition) and the documents that refer to it. Section numbers in brackets are TM54's own. The GLA guidance dates from September 2021 and cites the first edition title, so check which edition a planning condition expects.
Why a Part L model can't predict energy use
CIBSE draws the line clearly. The National Calculation Methodology exists to show that a building meets a minimum standard, in a repeatable way, by comparison with a notional building of the same shape and size. It uses prescribed templates for occupancy density, operating hours, set-points and airflow, and it leaves out unregulated uses such as small power, servers, external lighting and lifts. It was never meant to calculate actual energy use (section 4.2).
| Part L compliance model | TM54 performance model | |
|---|---|---|
| Question | Does the building beat the notional building? | How much energy will the building use in operation? |
| Occupancy and hours | Standard templates | Established with the occupier or client, and tested over a range |
| Energy uses | Heating, cooling, hot water, ventilation, fans and pumps, fixed lighting | Those, plus lifts and escalators, small power, catering, server rooms and other plant |
| HVAC and controls | Simplified, with template systems | As close to the design as the project needs |
| Result | Compliance rates | Annual use by end use, as a range |
Sources: CIBSE TM54 (2022), sections 4.2 and 4.3 and Box 1; Approved Document L, Volume 2, 2021 edition incorporating 2023 amendments, paragraph 9.4.
Approved Document L, Volume 2 says the same thing from the regulatory side. For new buildings with a total useful floor area over 1000m², the information handed to the owner should include a forecast of actual energy use in kWh a year by fuel, including unregulated loads, recorded in the building log book. TM54 is one of the listed methods, and the document adds that compliance outputs from SBEM or other compliance tools are not suitable for direct use as an energy forecast (paragraph 9.4). The submetering strategy should also be based on that forecast (paragraph 5.17b).
TM54 cites CIBSE TM61 case studies in which measured energy use came out as much as twice the modelled value, and says that gap has causes well beyond modelling, from specification and construction through commissioning to operation (section 4.2). What TM54 can do is reduce the part that comes from the model: poor modelling practice, missing loads, and untested assumptions about weather, hours and management.
What the method is built on
TM54 sets out six principles (section 4.3):
- modelling at a level of detail that suits the project, for heating, cooling, fans and pumps, with calculations for lighting, lifts, escalators and hot water
- dialogue with the occupiers, or a representative, and the building owner about hours and who will run the building
- every anticipated energy use in the building, not just the central plant
- energy reported by end use, consistent with the metering strategy, so it can be compared with sub-metered data
- scenario and sensitivity testing, with results as a range between a high and a low scenario
- comparison with project targets
The design-stage estimate is meant to represent a mid-range baseline. The scenarios around it are not an excessive margin: they show the range that plausible inputs produce, and which factors drive it (section 4.3).
Choosing the modelling level (step 0)
TM54 asks for a conversation with the client at the start about the scope, the tool, and which calculations sit inside or outside the model (section 7.1).
| Level | Typical tools | Suits |
|---|---|---|
| Quasi-steady state | PHPP, SAP, iSBEM, spreadsheets | Very simple buildings with no central air handling or mechanical cooling; a DSM is optional |
| Dynamic simulation, template HVAC | Dynamic modules of IES, TAS and DesignBuilder, EnergyPlus | Mid-range buildings such as smaller schools, shops and offices, where a simple HVAC representation is enough |
| Dynamic simulation, detailed HVAC | The same tools, with component-level HVAC modelling | Highly serviced or complex systems; contractual performance targets; systems and controls to be optimised in the model |
Source: CIBSE TM54 (2022), sections 4.4 and 7.1 and Table 3. TM54 notes that SAP had significant limitations for energy use estimation at the time of publication.
Three points from the guidance decide where a project lands:
- Part L templates. TM54 says Part L compliance templates are typically not appropriate for performance modelling, because the NCM simplifies them (for example, fresh air heated in the room, and zones not grouped to common systems). Where templates are used, check demand-responsive systems, systems that heat and cool at both central and terminal level, and pump pressures.
- HVAC share. If HVAC is a large part of the energy estimate, TM54 gives more than 25 to 30% as the point where a simplified HVAC calculation has a much larger effect on the result.
- RIBA stage. HVAC simulation is recommended at RIBA Stage 2, or Stage 3 at the latest, and the model should be kept live through construction so it can inform value engineering and match the as-built building at handover (Table 4).
The 17 steps in practice
TM54 has sixteen steps plus step 0 and a quality assurance step. Some can be left out where they don't apply, such as lifts in a building without them, but the report should say which were omitted and why (section 7). The points that most often shape the result:
| Step | What the guidance asks for |
|---|---|
| 1. Build the model | Use the floor area the model itself calculates, and make sure the area metric matches the target: gross internal area, total usable floor area (as used for DECs), treated floor area or net lettable area. Include thermal bridging and realistic infiltration, including the extra air exchange from people entering and leaving |
| 1. Weather | Test Reference Years for energy assessment. Design Summer Years are for overheating risk and are not recommended for annual energy evaluation |
| 2. Operating hours and occupancy | Ask the occupier, and ask beyond the occupied hours: cleaning, restocking, security, holidays. Plant hours differ from occupied hours and vary by end use. Where there is no occupier, estimate worst-case hours and test alternatives |
| 3. Lighting | Estimate energy with daylight and occupancy controls, and include standby loads, using the BS EN 15193 approach. Ask whether occupiers will add lighting at fit-out, which tends to be underestimated |
| 4 to 9. Lifts, small power, catering, servers, other plant, hot water | Calculate from expected use, not nameplate ratings. Small power should reflect average and sleep-mode consumption of the equipment, and older benchmarks can overstate it. Lifts follow BS EN ISO 25745. Server loads are commonly assumed at 50 to 75% of rated power, and scenario testing is recommended, for example with a 75% baseline |
| 10. Internal gains | Add the heat gains from loads calculated outside the model into the model, so heating and cooling respond |
| 11. HVAC and controls | Model at the level chosen in step 0 |
| 12. Management | Do not apply a fixed management factor. Interview the operator, list the likely operational risks and feed them into the scenarios. Poorly managed buildings can use two or three times the energy of well managed ones |
| 13. Sensitivity | Change one input at a time to find the influential ones, typically weather, occupancy density and hours, and management. Parametric analysis is available where risk quantification matters |
| 14. Scenarios | A mid-range baseline, with high and low scenarios, and optionally a worst case. No blanket variation such as plus or minus 10% on everything |
| 15. Review | Compare with targets and benchmarks, using the same floor area definition. A result below benchmark can mean a missing end use |
| 16. Report | Present the range, the sources and accuracy of key inputs, the split between designer-controlled and occupier-controlled loads, and a breakdown that maps to sub-meters. CIBSE provides an implementation matrix and outline report headings |
| 17. QA | Review by an experienced person before results go to other parties. An independent review is worth considering for contractual targets |
Source: CIBSE TM54 (2022), sections 7.2 to 7.18. Our summary; the guidance and its worked examples are in the document.
Step 12 is a change from the first edition. The modeller no longer applies a management factor to the result. The aim of testing management is not to allow for bad management but to show why good management matters and where design and controls can reduce the risk (section 7.13). That has a practical effect on how the scenarios are written and how they are explained to a client.
What London planning asks for
The GLA's be seen guidance applies to major developments and sets three reporting stages. For non-residential uses, TM54 appears in the first two.
| Stage | What is reported | Where TM54 comes in |
|---|---|---|
| Planning (RIBA Stage 2/3) | Energy use, carbon emissions and offset estimates for the whole development, with the energy strategy | Part L figures first, then analysis guided by TM54 reported in the be seen webform (paragraph 3.2.6) |
| As-built (from start of RIBA Stage 6, before handover) | Updated indicators for each non-residential reportable unit | A draft whole building DEC, with predicted consumption from the TM54 methodology and a predicted DEC grade and rating (paragraph 4.3.6) |
| In-use | Measured annual energy performance, as a DEC | The as-built estimates, which the owner must explain any underperformance against (paragraphs 5.1.2 and 5.1.7) |
Source: GLA, 'Be seen' energy monitoring guidance, September 2021, paragraphs 3.1.2, 3.2.5, 3.2.6, 4.1.1, 4.3.6, 5.1.2 and 5.1.7.
Points that decide whether a TM54 is needed on a given scheme:
- De minimis threshold. A reportable unit under 250m² GIA, with expected emissions under 5% of the development's total, only reports renewable generation. The threshold applies to the total area of the same typology or use, so a row of small shops that adds up to more than 250m² is reported as one unit (paragraph 2.4.10). A TM54 is required only for non-residential uses that are not de minimis (paragraph 3.2.6).
- Residential uses. They report using SAP for regulated energy and BREDEM 2012 for unregulated energy, not TM54 (paragraphs 3.2.4 and 4.3.4).
- In-use period. The building owner reports annual data for at least five years after the defects liability period, and the portal accepts up to ten years (paragraph 5.1.2).
- Whole life carbon. The TM54 findings should also represent the regulated and unregulated energy of module B6 (operational energy use) in the whole life-cycle carbon assessment for non-residential uses (paragraph 3.2.6).
- Target DEC rating. Applicants are encouraged to submit a target DEC rating at planning stage. The best practice target for a new office is DEC grade B, rating 40 (paragraphs 6.2.2 and 6.2.4).
TM54 itself recommends designing the metering strategy and the model outputs together, so the end-use breakdown in the model matches the sub-meters, and so a landlord's base building energy can be separated from tenants' energy. It points to CIBSE TM63 as the method for calibrating the model against in-use data (sections 6.3, 7.3 and 8).
What BREEAM asks for
BREEAM has changed its structure between versions, so check which version the project is registered under.
| Version | Where it sits | What it asks for |
|---|---|---|
| New Construction Version 6 | Ene 01, four credits for prediction of operational energy consumption | An energy design workshop at concept stage; additional energy modelling at design and post-construction stage; reported targets by end use with assumptions and inputs; and a risk assessment |
| New Construction Version 7 | Ene 02, prediction of operational energy and carbon | Predictive energy modelling and a predicted operational energy performance score, entered in an operational energy calculator (Guidance Note 53) |
Sources: BREEAM International New Construction Version 6 technical manual, Ene 01 (criteria 4 to 7 and the guidance on prediction of operational energy consumption); BREEAM Knowledge Base, Guidance Note 53 (KBCN1751, v0.2, February 2026). We checked the Version 6 wording in the International manual, not the UK 2018 manual.
In Version 6, the modeller creates a range of predicted consumptions from several scenarios, informed by a risk assessment of the building's energy uses. The scenarios cover weather, operating hours for systems, occupancy hours and management factors. That is close to TM54's own scenario approach, and the manual names TM54 as one way to estimate equipment energy demand where no operational modelling output is available. In Version 6 the four credits also count towards the energy minimum standards: Excellent can be met through them as an alternative to an EPR of 0.4, and Outstanding needs them as well as an EPR of 0.6. Our guide to Ene 01 scoring covers the Version 7 position.
Under Version 7, the calculator route is defined in Guidance Note 53, which only licensed assessors can download. Ask your assessor how a TM54 model maps onto it before the modelling is scoped.
What the modeller needs from the design team
TM54 gives structured questions for the occupier and the building manager (sections 7.3 and 7.13). In practice they come down to this list:
- The split of the development into reportable units, with the GIA of each, so the de minimis test can be applied.
- Intended operating hours for each area, including cleaning, restocking, security and holiday arrangements, and whether extended hours will be requested.
- Occupancy density and how it varies by day, week and year, with any hot-desking ratio.
- Equipment: workstation numbers, communal equipment, lifts and escalators, catering, server rooms and any special loads, with average use rather than nameplate ratings.
- Whether occupiers will add lighting or equipment at fit-out.
- The HVAC strategy and controls description, with part-load performance data where the systems are modelled in detail.
- Management: whether there will be an energy manager, planned maintenance, sub-metering with monitoring, energy targets in the facilities contract, and a landlord and tenant arrangement on sharing savings.
- The metering strategy, so the model's end-use breakdown can map onto it.
- The planning condition, BREEAM version and credits targeted, and the target and the floor area metric it uses.
More on the service: TM54 operational energy assessments and GLA and London Plan energy statements.



